| Reference Number | TPC/5/10/115 |
| Title | National Theatre Electrical Layout Olivier Theatre North Ear and Part Rear Flank Walls |
| Level | Item |
| Date | 19 May 1978 |
| Description | Crown House Engineering Ltd drawing number 904/798/R. Drawn by D P G. |
| Extent | 1 drawing |
| Series | Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings |