Reference Number | TPC/5/10/158 |
Title | National Theatre Electrical Layout Olivier Theatre Trunking and Conduit Feed Auditorium Front Wall |
Level | Item |
Date | 15 April 1978 |
Description | Crown House Engineering Ltd drawing number 904/7128/R. Drawn by P W. |
Extent | 1 drawing |
Series | Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings |