| Reference Number | TPC/5/10/18 |
| Title | National Theatre Electrical Layout Olivier Theatre Flytower Level 96.00 Working Light System |
| Level | Item |
| Date | 05 December 1978 |
| Description | Crown House Engineering Ltd drawing number 904/228/R. |
| Extent | 1 drawing |
| Series | Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings |