Reference Number | TPC/5/10/19 |
Title | National Theatre Electrical Layout Olivier Theatre Flytower Level 106.00 Working Light System |
Level | Item |
Date | 05 December 1978 |
Description | Crown House Engineering Ltd drawing number 904/229/R. |
Extent | 1 drawing |
Series | Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings |