Skip to main content.
Medium FontSize
Larger FontSize
Largest FontSize
Home
Advanced Search
Catalogue
Persons
Places
Showcase
Image Gallery
Home
About the Catalogue
Search the Catalogue
Search by Person
Search by Production
Search by Role
How to Search
Useful Links
Contact Us
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
TPC - Theatre Projects Consultants Collection
1 - Business Files
2 - Standardised Paperwork - Letters, Contracts, Schedules and Specfications
3 - Stage Machinery Operating Instructions, Manuals and Handbooks
4 - Press and Publications
5 - Architectural and Engineering Drawings
1 - National Theatre - Stage Engineering Drawings
2 - Theatre Projects Consultants Ltd Drawings
3 - Theatre Projects Consultants Ltd (Denys Lasdun & Partners) Drawings
1 - Upper Theatre Section on Axis, Part 1 - Fly Tower
2 - National Theatre: Upper Theatre Lighting Layout Bridges; National Theatre Upper Auditorium Plan at 87.00
3 - Level 7 Perches at 21.25' Working Lights; National Theatre Lower Theatre Plan Level 21.25
4 - Levels 6 and 8 Perches and S. Level Working Lights; National Theatre Lower Plan Levels 27 and 30.50
5 - Working Lights Fly Gallery/Aud[itorium] Void; Lower Theatre Plan at 47.00 Levels 4 + 10
6 - Working Lights Level 2 Loading Gallery; National Theatre Lower Theatre Plan at 83.00
7 - Working Lights Int Gallery Level 3; Lower Theatre Plan at 63.00
8 - Sound and Comms Outlets; Upper Theatre and Offices Group Grids E-L Plan at Level 16.00
9 - Sound and Communication Outlets; Upper Theatre and Offices Group, Grids L-Q, Plan at Levels 38.00 and 39.75
10 - Sound and Communication Outlets; Upper Theatre and Offices Group, Grids E-L, Plan at Levels 38.00 and 39.75
11 - Sound and Communication Outlets; Upper Theatre and Offices Group, Grids L-Q, Plan at Level 49.00
12 - Sound and Communication Outlets; Upper Theatre and Offices Group, Grids E-L, Plan at Level 49.00
13 - Sound and Communication Outlets; Upper Theatre and Offices Group, Grids L-Q, Plan at Level 59.25
14 - Sound and Communication Outlets; Upper Theatre and Offices Group Grids E-L Plan at Level 59.25
15 - Sound and Communications Facilities; National Theatre Lower Theatre Plan Levels 12 and 16
16 - Sound and Comms. Facilities; National Theatre Lower Plan Levels 27 and 30.50, 24.75
17 - Sound and Communications; National Theatre, Lower Theatre, Plan at 38.00 and 34.50
18 - Sound and Comms Outlets; National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Levels 27.00 and 30.50
19 - Sound and Communications; Upper Theatre Section on Axis Part 2 - Auditorium
20 - Sound and Comms. Facilities; Upper Theatre and Offices Group, Grids E-L, Plan at Level 79.50
21 - Sound and Comms. Facilities; Upper Theatre and Offices Group, Grids E-L, Plan at Level 106 00
22 - Front of House T.V. and Paging Points; F.O.H. Upper Theatre, Entrance Hall at Road and Lower Cloakroom, Level 16.00
23 - Front of House T.V. and Paging Points; F.O.H. Lower Theatre Level 16.00
24 - Front of House T.V. and Paging Points; F.O.H. Lower Theatre Level 27.00
25 - Front of House T.V. and Paging Points; F.O.H. Upper Theatre Terrace Entrance Upper Cloakroom Level 38.00
26 - Front of House T.V. and Paging Points; F.O.H. Lower Theatre Levels 38.00 + 32.92
27 - Front of House T.V. and Paging Points; F.O.H. Upper Theatre Main Foyer Level 49.00
28 - Front of House T.V. and Paging Points; F.O.H. Upper Theatre Foyer Balcony Level 59.25
29 - Front of House T.V. and Paging Points; F.O.H. Upper Theatre Balcony Foyer Level 69.50
30 - Front of HSE. T.V. and Paging Points; F.O.H. Upper Theatre, Restaurant, Level 27.00
31 - Builder's Work; Basement Plan Level 1.00 etc South
32 - Builder's Work; Basement Plan Level 1.00 etc East
33 - Builder's Work; Basement Plan Level 4.00 etc North
34 - Builder's Work; Basement Plan Level 4.00 etc West
35 - Builder's Work; National Theatre Lower Theatre Long Section on C/L
36 - Builder's Work; National Theatre Lower Theatre Plan Levels 12 and 16
37 - The New National Theatre Builders Work Details; F.O.H. Upper Theatre Entrance Hall at Road and Lower Cloakroom Level 16.00
38 - The New National Theatre Builders Work Details; National Theatre Upper Theatre and Offices Group Grids E-L Plan at Level 16.00
39 - The New National Theatre Builders Work Details; National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Levels 12.00 and 16.00
40 - The New National Theatre Builders Work Details; National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Level 21.25
41 - The New National Theatre Builders Work Details; National Theatre Upper Theatre and Offices Group Grids E-L Plan at Level 27.00
42 - Builders Work; National Theatre Upper Theatre and Offices Group Grids E-L Plan at Level 27.00
43 - Builders Work; National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Levels 27.00 and 30.50
44 - The New National Theatre Builders Work Details; National Theatre Upper Theatre and Offices Group Grids E-L Plan at Levels 38.00 and 39.75
45 - The New National Theatre Builders Work Details; National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Levels 38.00 and 39.75
46 - Builder's Work; National Theatre Upper Theatre and Offices Group Grids E-L Plan at Level 49.00
47 - Builder's Work; National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Level 49.00
48 - Builder's Work; National Theatre Upper Theatre and Offices Group Grids E-L Plan at Level 59.25
49 - Builder's Work; Upper Theatre and Offices Group, Grids L-Q, Plan at Level 59.25
50 - Builder's Work; Upper Theatre and Offices Group, Grids E-L, Plan at Level 69.50
51 - Builder's Work; Upper Theatre and Offices Group, Grids L-Q, Plan at Level 69.50
52 - Builder's Work; Upper Theatre and Offices Group, Grids E-L, Plan at Level 79.50
53 - Builder's Work; Upper Theatre and Offices Group, Grids E-L, Plan at Level 83.50
54 - Builder's Work; National Theatre Lower Theatre Plan, Level 21.25
55 - Builders Work; National Theatre Lower Plan Levels 27 and 30.50
56 - Builder's Work; Lower Theatre, Plan at 47.00-[40.00]
57 - Builder's Work; Flytower - Upper Theatre, Permanent Shuttering to Internal Walls 2
58 - Builder's Work; Flytower - Upper Theatre, Permanent Shuttering to Internal Walls 1
59 - Electrical Layout to Proscenium Slot Level +12.00; Lower Theatre Auditorium Plan Front
60 - National Theatre Electrical Layout; Lower Theatre West Side Plan at 12.00, 16.00
61 - Electrical Layout; Lower Theatre Left (East) Side Plan at 12.00 Level
62 - Electrical Layout; Lower Theatre Stair No 34
63 - Electrical Layout; Lower Theatre Left (East) Side Plan at 21.25 Level
64 - Electrical Layout; Lower Theatre Left (East) Side Plan at 47.00-40.00 Level
65 - National Theatre Electrical Layout; Lower Theatre West Side Plan at 21.25
66 - National Theatre Electrical Layout; Lower Theatre Left (East) Side Plan at 30.50 Level
67 - National Theatre Electrical Layout; Lower Theatre West Side Plan at 27.00 30.50
68 - National Theatre Electrical Layout; Lower Theatre Left (East) Side Plan at 38.00 Level
69 - Electrical Layout to Stage Left at 38.00; Lower Theatre, West Side, Plan at 38.00
70 - Electrical Layout Loudspeakers 1; Lower Auditorium Concrete Details
71 - Electrical Layout Side Walls East Lower; Lower Auditorium Formwork Stalls East Wall
72 - Electrical Layout Side Walls West Lower; Lower Auditorium Formwork Stalls West Wall
73 - Electrical Layout Balcony Front; Lower Auditorium Formwork Control Rooms and Balcony Front
74 - Electrical Layout; Lower Theatre Control Suite Plan and Sections
75 - New National Theatre Electrical Layout; Upper Theatre and Offices Group Plans of Lighting Perch Stair Stage Right Upper Theatre
76 - Electrical Layout; Upper Theatre and Offices Group Central Stalls Level 38.00 to 49.00
77 - Electrical Layout. Upper Theatre Balcony; Upper Theatre and Offices Group Balcony
78 - Foyer Lighting Level 5.50; Basement Plan, Level 4.00 etc North
79 - Foyer Lighting Level 16 00, Floor; F.O.H. Upper Theatre, Entrance Hall at Road and Lower Cloakroom, Level 16.00
80 - [Foyer Lighting for Level 16.00 Grid, and Diagrid Lighting and Sound for Level 16:00; F.O.H. Upper Theatre, Restaurant, Level 27.00]
81 - Foyer Lighting Level 27 00 Floor; F.O.H. Upper Theatre, Restaurant, Level 27.00
82 - [Foyer Lighting Levels 16.00 and 27.00 Grid and Diagrid Lighting and Sound for Levels 16.00 and 27.00; F.O.H. Upper Theatre, Terrace Entrance, Upper Cloakroom, Level 38.00]
83 - Foyer Lighting Level 38 00, Floor; F.O.H. Upper Theatre, Terrace Entrance, Upper Cloakroom, Level 38.00
84 - [Foyer Lighting Level 38 00, Grid; and Diagrid Lighting and Sound for Level 38.00; F.O.H. Upper Theatre, Main Foyer, Level 49.00]
85 - Foyer Lighting Level 49 00, Floor; F.O.H. Upper Theatre, Main Foyer, Level 49.00
86 - [Foyer Lighting Level 49 00, Grid and Diagrid Lighting for Level 49 00; F.O.H. Upper Theatre, Foyer Balcony, Level 59.25]
87 - Foyer Lighting Level 59.25, Floor; F.O.H. Upper Theatre, Foyer Balcony, Level 59.25
88 - [Foyer and Diagrid Lighting Levels 49.00 and 59.25, Grids; F.O.H. Upper Theatre, Balcony Foyer, Level 69.50]
89 - Foyer Lighting Level 69.50, Floor; F.O.H. Upper Theatre, Balcony Foyer, Level 69.50
90 - Foyer Lighting Level 69.50, Grid; F.O.H. Upper Theatre, Roof Plan Level 79.75
91 - Lower Theatre Foyer Lighting Level 16.00, Floor; F.O.H. Lower Theatre, Level 16 00
92 - [Lower Theatre Foyer Lighting and Diagrid Lighting, and Sound Level 16.00, Grid; F.O.H. Lower Theatre, Level 27 00]
93 - Lower Theatre Foyer [Lighting] Level 27.00, Floor; F.O.H. Lower Theatre, Level 27.00
94 - [Lower Theatre Foyer Lighting and Diagrid Lighting, and Sound Level 27.00, Grid; F.O.H. Lower Theatre, Levels 38.00 + 32.50]
95 - Lower Theatre Foyer Lighting Levels 32.50 and 38.00 Floors; F.O.H. Lower Theatre Levels 38.00 and 32.50
96 - Lower Theatre Foyer Lighting Levels 32.50 and 38.00 Grids; F.O.H. Lower Theatre Roof Plan 49.50
97 - National Theatre Floodlighting; F.O.H. Upper Theatre, Balcony Foyer, Level 69.50
4 - Denys Lasdun & Partners Drawings
5 - Denys Lasdun & Partners / Flint & Neill Ltd / Davis, Belfield & Everest Drawings
6 - Mole-Richardson (Stage & Studio Engineering) Ltd Drawings
7 - Evershed Power-Optics Ltd Drawings
8 - Hall Stage Equipment Ltd Drawings
9 - Tele-Stage Associates Ltd Drawings
10 - Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings
11 - Crown House Engineering Ltd Drawings
12 - Rank Strand Electric Ltd Drawings
13 - Varilectric Ltd Drawings
14 - Waagner-Biro Drawings
15 - P E Kemp Engineers Ltd Drawings
16 - Gough & Co (Hanley) Ltd Drawings
17 - J S Edwards (Engineers) Ltd Drawings
18 - United Lift & Escalator Co Ltd Drawings
19 - Loxton Engineering Services Ltd Drawings
20 - Ainslie Controls Ltd Drawings
21 - Outline of Slipring Collector Column
22 - The Lyttelton Theatre Side Elevation
23 - The Olivier Theatre Plan at Stage Level
Powered by
CalmView
© 2008-2025