Skip to main content.
Medium FontSize
Larger FontSize
Largest FontSize
Home
Advanced Search
Catalogue
Persons
Places
Showcase
Image Gallery
Home
About the Catalogue
Search the Catalogue
Search by Person
Search by Production
Search by Role
How to Search
Useful Links
Contact Us
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
TPC - Theatre Projects Consultants Collection
1 - Business Files
2 - Standardised Paperwork - Letters, Contracts, Schedules and Specfications
3 - Stage Machinery Operating Instructions, Manuals and Handbooks
4 - Press and Publications
5 - Architectural and Engineering Drawings
1 - National Theatre - Stage Engineering Drawings
2 - Theatre Projects Consultants Ltd Drawings
3 - Theatre Projects Consultants Ltd (Denys Lasdun & Partners) Drawings
4 - Denys Lasdun & Partners Drawings
1 - National Theatre Lower Auditorium Stalls
2 - Lower Auditorium, Balcony Entrance
3 - Lower Auditorium, Balcony
4 - Lower Auditorium, Section
5 - National Theatre and Opera House, Lower Auditorium, Ceiling Plan
6 - Lower Auditorium, Level 21.25 Perch
7 - National Theatre and Opera House, Lower Auditorium, Roof Plan
8 - Lower Auditorium, Ceiling Plan
9 - Plan B, Levels +4.00, +2.00, -+0.00
10 - Plan E, Levels 25.25, 27.00, 30.50
11 - Plan F, Levels 32.50, 38.00, 39.75
12 - Plan G, Level 49.00
13 - Plan H, Level 59.25
14 - Plan I, Level 69.50
15 - Plan J, Levels 79.75, 85.25
16 - Plans and Sections of Proscenium Fly Tower
17 - Upper Auditorium, Stage Level
18 - National Theatre and Opera House, Upper Auditorium, Stalls Plan
19 - Upper Auditorium, Balcony Plan
20 - Upper Auditorium, Ceiling Plan
21 - Upper Auditorium, Plant Room
22 - Upper Auditorium, Section A-A
23 - Upper Auditorium, Roof Plan
24 - Upper Auditorium, Restaurant Level
25 - Site Plan
26 - Plan B, Levels -6.00 to +4.00
27 - Plan C, Levels 12.00, 16.00
28 - Plan D, Levels 21.25
29 - Plan E, Levels 25.25, 27.00, 30.50
30 - Plan F, Levels 32.50, 38.00, 39.75
31 - Plan G, Level 49.00
32 - Plan H, Level 59.25
33 - Plan I, Level 69.50
34 - Plan J, Levels 83.50, 87.00
35 - Sections A-A and C-C
36 - Section B-B
37 - Levels -2.00', +1.00', +4.00', Basement Plan S.E.
38 - Levels +4.00, -3.00 and -2.00, Plant Rooms and Car Parking Plan
39 - Levels -4, -3, +1, Basement, Plan South
40 - Basement Plan, West, Levels 6.50, 4.00, 2.00
41 - Levels 12.00'-16.00', Ground Floor Plan S.E.
42 - Level +16.00, Stage Entrance and Recording Studio, Plan
43 - Levels 12, 16, Ground Floor Plan
44 - Level 27.00 North, Plan E
45 - Levels 39.75 and 38.00, Plan East
46 - Level 38.00 North, Plan F
47 - Level 69.50 North
48 - Diagonal Section F.O.H. Upper Theatre
49 - Section for Proscenium Theatre
50 - Offices, General Details
51 - Basement Plan, Level 1.00 etc, East
52 - Basement Plan, Level 4.00 etc, North
53 - Basement Plan, Level 1.00 etc, South
54 - Basement Plan, Level 4.00 etc, West
55 - Basement, Stairs 01 and 02, Setting Out Details
56 - Basement, Lift Lobby Setting Out Floor Plan
57 - Basement, Lift Lobby, Ceiling Plan
58 - Basement, Stairs 01 and 02, Sections
59 - Basement, Lift Lobby, Sections
60 - F.O.H. Upper Theatre, Entrance Hall at Road and Lower Cloakroom, Level 16.00
61 - F.O.H. Lower Theatre, Level 16.00
62 - National Theatre F.O.H. Upper Theatre, Restaurant, Level 27.00
63 - F.O.H. Lower Theatre, Level 27.00
64 - F.O.H. Upper Theatre, Terrace Entrance, Upper Cloakroom, Level 38.00
65 - F.O.H. Lower Theatre, Levels 38.00 + 32.92
66 - F.O.H. Upper and Lower Theatre, Walkway Level 32 92
67 - F.O.H. Upper Theatre, Main Foyer, Level 49.00
68 - F.O.H. Lower Theatre, Roof Plan, 49.50
69 - F.O.H. Upper Theatre, Foyer Balcony, Level 59.25
70 - F.O.H. Upper Theatre, Balcony Foyer, Level 69.50
71 - F.O.H. Upper Theatre, Roof Plan Level 79.75
72 - F.O.H. Upper Theatre, Section
73 - F.O.H. Upper Theatre, Section
74 - F.O.H. Upper Theatre, Section
75 - F.O.H. Lower Theatre, Section
76 - F.O.H. Lower Theatre, Section
77 - Diagonal Section Through Bars
78 - F.O.H. Upper and Lower Theatre, Section
79 - F.O.H. Lower Theatre, Section
80 - F.O.H. and Lower Theatre, Exitstairs from Auditorium, Section
81 - F.O.H. and Lower Theatre, Exitstairs from Auditorium, Plans at Levels 16.00 and 27.00
82 - Bar + Box Office, Reflected Ceiling
83 - Letter to TPC from J Howard of Denys Lasdun & Partners
84 - Upper Theatre and Offices Group Grid L-Q Plan at Levels 12.00 and 16.00
85 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 16.00
86 - National Theatre Upper Theatre and Offices Group Grids L-Q Plan at Levels 21.25, 12.00 and 16.00
87 - Upper Theatre and Offices Group, Grids L-Q, Plan at Levels 27.00 and 30.50
88 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 27.00
89 - Upper Theatre and Offices Group, Grids L-Q, Plan at Levels 38.00 and 39.75
90 - Upper Theatre and Offices Group, Grids E-L, Plan at Levels 38.00 and 39.75
91 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 49.00
92 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 59.25
93 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 59.25
94 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 69.50
95 - Upper Theatre and Offices Group Grids E-L Plan at Level 69.50
96 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 79.50
97 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 79.50
98 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 83.50
99 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 83.50
100 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 96.00
101 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 96.00
102 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 106.00
103 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 106.00
104 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 115.00
105 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 115.00
106 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 124.00
107 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 124.00
108 - Upper Theatre and Offices Group, Grids L-Q, Plan at Level 132.00 (Grid)
109 - Upper Theatre and Offices Group, Grids E-L, Plan at Level 132.00 (Grid)
110 - Upper Theatre and Offices Group, Grids L-Q, Plans at Levels 144.00' and 156.00'
111 - Upper Theatre, Section on Axis, Part 1 - Fly Tower
112 - Upper Theatre, Section on Axis, Part 2 - Auditorium
113 - Upper Auditorium Setting Out Levels 49.00' and 69.50' Stalls and Balcony
114 - Upper Theatre and Offices Group, Dressing Rooms, Level 12.00', Services Layout
115 - Upper Theatre and Offices Group, Dressing Rooms, Level 21.25', Services Layout
116 - Upper Theatre and Offices Group, Dressing Rooms, Level 30.50', Services Layout
117 - Upper Theatre and Offices Group, Dressing Rooms, Level 39.75, Services Layout
118 - Upper Theatre and Offices Group, Stage Door Entrance, Level 16.00', Services Layout
119 - Upper Theatre and Offices Group, Canteen and Green Room, Level 27.00
120 - Upper Theatre and Offices Group, Practice Rooms, Music Room and Adjacent Areas, Services Layout, Level 38.00
121 - Upper Theatre and Offices Group, Rehearsal Rooms and Corridor, Level 49.00, Services Layout
122 - Upper Theatre and Offices Group, Rehearsal Rooms and Corridor, Services Layout
123 - Upper Theatre and Offices Group, Wardrobe Store, Level 16.00'
124 - Flytower - Upper Theatre Permanent Shuttering to Internal Walls 1
125 - Flytower - Upper Theatre Permanent Shuttering to Internal Walls 2
126 - Flytower - Upper Theatre Permant Shuttering Ceiling Plan
127 - Upper Theatre and Offices Group, Grids L-Q, Plan at 49.00'
128 - Upper Theatre and Offices Group Grids L-Q Plan at 59.25'
129 - Upper Theatre and Offices Group, Stage Staff Area, Level 39.75'. Services Layout
130 - Studio Theatre Section AA
131 - New Door Added, C339. and Steps Altered 12.00 Level to 15.00 Level
132 - Ceiling Plan Studio Theatre with Letter
133 - Studio Theatre Plans and Sections of Corridor South of Gridline L
134 - Workshops Plan at 12.0 East
135 - Workshops Plan at 12.0 West
136 - National Theatre Lower Theatre Plan, Level 21.25 (d)
137 - Workshops Plan at 24.0 and 29.0 East
138 - Workshops Plan at 25.50 and 29.0 West
139 - Lower Plan Levels 27 and 30.50, 24.75 (e)
140 - Workshops Plan at Beam Level (40.25) East
141 - Workshops Plan at Beam Level (40.25) West
142 - Workshops Plan at 47.00 with Rooflight Kerbs East
143 - Workshops Plan at 47.00 with Rooflight Kerbs West
144 - Lower Theatre Plan at 47.00-40.00
145 - Workshops Plan at 55.00 East
146 - Workshops Plan at 55.00 West
147 - Lower Theatre, Plan at 49.50 (g)
148 - Lower Theatre, Plan at 62.00, Auditorium Roof Plan (h)
149 - Lower Theatre, Plan at 71.00 (i)
150 - Lower Theatre Plan at 83.00 (j)
151 - Lower Theatre Plan at 91.00 (k)
152 - Lower Theatre Plan at 101.50 (l)
153 - National Theatre Lower Theatre, Long Section on C/L
154 - National Theatre Lower Theatre Cross Section Between Grids L and M (4'8" from L)
155 - National Theatre Lower Theatre Cross Section Between N-M
156 - National Theatre Lower Theatre Section Between 15-16 Fly Tower on C/L
157 - Lower Theatre Cross Section Between K-J 8'0" from K
158 - Lower Theatre Cross Sections Between K-3'11" and 1.'3" from J
159 - Lower Theatre Cross Section Between L-M 4'.0" from M East
160 - Lower Theatre Cross Section Between L-M 4'. from M West
161 - Lower Theatre Cross Section Between M-L
162 - Lower Theatre Sections Between 18-19 5'0" from 18. A Looking East; B Looking West
163 - Workshops Section Between 6-7
164 - Lower Theatre - Sections. A - Between 18-19, 1'0" from 18; B - Between 17-18, 12'0" from 18; C - Through Lift Motor Room
165 - Workshops Cross Section on C/L Between 15-16
166 - Lower Theatre Cross Section Between M-L
167 - Workshops Long Section Between S-R Sheet 1
168 - Workshops Long Section Between S-R 5'.00" + 9.'00" from R Sheet 2
169 - Workshops Long Section Between S-R 9.'00" from R Sheet 3
170 - Lower Theatre West Side Plan at 12.00 16.00
171 - Lower Theatre West Side Plan at 21.25
172 - Lower Theatre West Side Plan at 27.00 30.50
173 - Lower Theatre West Side Plan at 38.00
174 - Lower Theatre West Side Plan at 47.00
175 - Lower Theatre West Side Plan at 49.50
176 - Lower Theatre West Side Reflected Ceiling Plan Over Corridor and Staircase No 35 at Levels 9.66 12.00 and 16.00
177 - Lower Theatre + Workshops North-East Elevation (Sheet 1)
178 - Workshops, Rehearsal Rooms, Long Section Between Q-P, Cross Section Between 13-14
179 - Workshops Rehearsal Rooms, Long Section Between R-Q, Cross Section Between 10-11
180 - Workshops, Cross Section on C/L Between 15-16
181 - Lower Theatre Left (East) Side Plan at 12.00 Level
182 - Lower Theatre Left (East) Side Plan at 21.25 Level
183 - Lower Theatre Left (East) Side Plan at 30.50 Level
184 - Lower Theatre Left (East) Side Plan at 38.00 Level
185 - Lower Theatre Left (East) Side Plan at 47.00-40.00 Level
186 - Workshops Plan at 12.0 East + Layout of Machinery (c)
187 - Ground Works West Sheet 1
188 - Ground Works North Sheet 2
189 - Grounds Works North East Sheet 3
190 - Grounds Works North East Sheet 4
191 - Grounds Works North East Sheet 5
192 - Ground Works South West Sheet 6
193 - Groundworks Setting Out Paving at Box Office
194 - Groundworks Paving at Box Office Sections
195 - Lower Auditorium Stalls
196 - Lower Auditorium, Level 21.25 Perch
197 - Lower Auditorium, Balcony Entrance
198 - Lower Auditorium, Balcony
199 - Lower Auditorium, Plan at 47.00 Level
200 - Lower Auditorium, Fly Tower Plans 1
201 - Lower Auditorium, Section A-A
202 - Lower Auditorium, Section B-B
203 - Lower Auditorium, Fly Tower Plans 2
204 - Lavatories, Front of House, Women's' Lavatory, Men's' Lavatory
205 - National Theatre Front of House, Men's Lavatories No 2 E02, 2 F02, 2 F05, 2 G01, 2 G03
206 - National Theatre Lavatories Front of House, Women's Lavatory no 2 F01 [3606], Men's Lavatory no 2 C07 [0605]
207 - National Theatre Front of House, Women's Lavatory No 2 E01 [2605] at 27.00 Level
208 - National Theatre Front of House, Women's Lavatories [3516] No 2 F06, [3527] 2 F03, [2508] 2 E03
209 - National Theatre Front of House, Men's Lavatories No 2 I01 [6513] and 2 I03 [6506] at 69.50 Level
210 - National Theatre Front of House, Men's Lavatory No 2 H02 [5504] at 59.25 Level
211 - National Theatre Lavatories, Front of House, Women's Lavatory No 2 C08 [0628] Sections (for Plan See 552/02/2501)
212 - National Theatre F.O.H. and Lower Theatre, Exitstairs from Auditorium, Stairs No 6 (Handed) and 7 Section
213 - National Theatre F.O.H. and Lower Theatre, Exitstairs from Auditorium, Stairs Nr. 6 (Handed) and 7, Plans at Levels 16.00 and 27.00
214 - National Theatre F.O.H. Stairs 08, Section A-A, B-B, Stairs 05, Similar but Handed
215 - National Theatre F.O.H. Stairs 05 08, Level 16.00
216 - National Theatre F.O.H. Stairs 05 08, Level 27.00
217 - National Theatre F.O.H. Stairs 05 08, Level 38.00
218 - National Theatre F.O.H. Stair 09, Section A-A
219 - National Theatre F.O.H. Stair 09, Plans
220 - National Theatre Front of House, Staircase Nr 31, Section
221 - National Theatre Front of House, Stairs 01 and 02, Section AA
222 - National Theatre F.O.H. Stairs 04, Section B1
223 - National Theatre F.O.H. Stairs 01 02 03, Section B2
224 - National Theatre F.O.H. Stairs 01 02, Plan Level 16.00
225 - National Theatre F.O.H. Stairs 01 02 03, Plan Level 27.00
226 - National Theatre F.O.H. Stairs 01 02 03, Plan Level 38.00
227 - National Theatre F.O.H. Stairs 01 02, Plan Level 49.00
228 - National Theatre F.O.H. Stairs 01 02 04, Plan Level 59.25
229 - National Theatre F.O.H. Stairs 01 02 04, Plan Level 69.50
230 - National Theatre Front of House, Lower Theatre, Bar at 16.00 Level
231 - National Theatre Front of House, Bar and Box Office, Plan at 16.00 Level
232 - National Theatre Front of House, Bar Area, Plan at 27.00 Level
233 - National Theatre Front of House, North Corridor at 69.50 Level
234 - National Theatre Front of House, Plans at 16.00 Level: Cloakroom, Reception Room and Staff Room
235 - National Theatre Front of House, Plan at 27.00 Level
236 - National Theatre Front of House, South Corridor at 69.50
237 - National Theatre F.O.H. and Lower Theatre, Stairs No. 6 (Handed) and 7, Section 02/2587
238 - National Theatre F.O.H. and Lower Theatre Section 02/2588
239 - National Theatre F.O.H. Upper Cloakroom Plan and Section at 38.00
240 - National Theatre F.O.H. Plan at 38.00 Level, Reception Room, Lav. 2 F04 3524
241 - National Theatre Front of House, Plan at 38.00 Level, Theatre Manager + Housekeeper, Lav. 2 F07, Room no. 3508
242 - National Theatre Front of House, Women's Lavatory No 2 I04 [6508] at 69.50 Level
243 - National Theatre Front of House, Women's Lavatory No 2 I02 at 69.50 Level [6515]
244 - National Theatre F.O.H. and Lower Theatre, Corridor Along Gridlines 17 and 18 and Between Gridlines J and L
245 - National Theatre Front of House, Women's Lavatory No 2 G02 at 49.00 Level [4522]
246 - National Theatre Front of House, Women's Lavatory No 2 H01 at 59.25 Level [5508]
247 - National Theatre Front of House, Women's Lavatory No 2 G04 at 49.00 Level [4509]
248 - National Theatre Telephone and Hosereel Recess - G.L. L/17, Levels 16.00 and 27.00
249 - National Theatre Front of House, South Area at 49.00 Level
250 - National Theatre Front of House, North Area at 49.00 Level
251 - National Theatre Front of House, South Area at 59.25 Level
252 - National Theatre Front of House, North Area at 59.25 Level
253 - National Theatre Front of House, Central Corridor at 69.50
254 - National Theatre Front of House, Central Corridor at 49.00 Level
255 - National Theatre Front of House, Buffet Level 38.00
256 - National Theatre Front of House, Buffets Level 59.25 (Two Handed)
257 - National Theatre Front of House, Bar, Level 16.00
258 - National Theatre Front of House, Bar, Level 16.00
259 - National Theatre Front of House, Bars, Level 16.00 and 27.00
260 - National Theatre Front of House, Bars, Level 49.00, 2 Handed
261 - National Theatre Front of House, Bars, Level 69.50, 2 Handed
262 - National Theatre Front of House, Bars and Buffets, Ceiling Plans
263 - National Theatre Front of House, Restaurant Dispense Bar 27.00 Level
264 - National Theatre F.O.H. Cupboards, 49.00 Level G.L. J/12-13, 38.00 Level G.L. E/9
265 - Upper Theatre and Offices Group Upper Theatre Section on Axis Part 2 Auditorium
266 - Upper Theatre and Offices Group Section and Plan Lighting Bridge 4
267 - Upper Theatre and Offices Group Section and Plan Lighting Bridge 1
268 - Upper Theatre and Offices Group Section and Plan Lighting Bridge 3
269 - Upper Theatre and Offices Group Section and Plan Lighting Bridge 1A/1B
270 - Upper Theatre and Offices Group. Acoustic Lining to Rehearsal Rooms 1 and 2 (Levels: 49.00, 59.25)
271 - National Theatre Bar and Lavatories, Studio Theatre at 27.00 Level
272 - National Theatre Studio Theatre, Main Entrance Office and Cloakroom, 16.00 Level
273 - Sections Studio Theatre FOH
274 - National Theatre Studio Theatre, Setting Out of Steelwork and Ductwork on the Ceiling of the Auditorium
275 - Upper Theatre and Offices Group. Quick Change Level 38.00
276 - Upper Theatre and Offices Group: Quick Change Near Stair 12 Level 39.75
277 - Upper Theatre and Offices Group - Quick Change Near Stair 12 Level 39.75
278 - National Theatre Heated Drying Room, Partitions (Deflection Area), Level 59.00, Door H 366 Grid L-M
279 - Upper Theatre and Offices Group Large Rehearsal Room Wall Elevations and Details Sheet 1
280 - Upper Theatre and Offices Group Large Rehearsal Room Wall Elevations and Details Sheet 2
281 - Upper Theatre and Offices Group Large Rehearsal Room Wall Elevations and Details Sheet 3
282 - Upper Theatre and Offices Group. Storeman's Room (0123)
283 - National Theatre Upper Theatre and Offices Group Chandeliers at Lighting Bridges 3 and 4
284 - Dressing Table Unit - Directors Dressing Room
285 - National Theatre Upper Theatre and Offices. Offices Closer Panel Details
286 - Upper Theatre and Offices Group Edge Details Lighting Bridge 3
287 - Cupboard and Panelling Sinks and Outlets in Costume Spraying Room
288 - Upper Theatre and Offices Group, Drying Cupboard - Wig Workroom. Level 49.00
289 - Upper Theatre and Offices Group Setting Out of Property Store Etc. Backstage Upper Theatre (39.75)
290 - Elevation and Plan of Partition Between 6 Person Dressing Rooms
291 - Cupboard Unit Underneath Double Sinks on 49.00 and 59.00L. Workrooms
292 - Offices. Cross Partition Details
293 - Offices. Cross Partition Details
294 - Upper Theatre Elevation of Back Wall at 69.50
295 - Upper Theatre and Offices. Office Corners - E/F and 4/5, P/Q and 12/13, and 4/5 and P/Q. Cill Layout
296 - Cill Layout. Workroom Court. Levels 49.00'/59.25'
297 - Elevation of Women's Costumes Workroom at Level 49.00
298 - Elevation of Leather Workroom and Details of Framing at Level 59.25
299 - Upper Theatre and Offices Details of Door Openings Requiring Steel Doors
300 - Upper Theatre Elevation of Wig Workroom 49.00 Level
301 - Removable Rostrum Above Vomitory Stairs Upper Auditorium
302 - Stair No 11 Sheet 1 Plans
303 - Stair No 11 [Sheet 2 Plans]
304 - Stair No 12 Sheet 1 Plans
305 - Stair No 13 Sheet 1 Plans Levels 2.75', 12.00', 21.25', 30.50', 39.75'
306 - Stair No 13 Sheet 2 Plans
307 - Stair No 13 Sheet 3 Plan
308 - Stair No 13 Sheet 4 Section
309 - Stair No 32 Sheet 2 Section and Detail
310 - National Theatre Dressing Room Details, Plan of Make-up Table Unit
311 - National Theatre Dressing Room Details, Make up Table Unit, Plan Below Table Level
312 - Dressing Room Details, Make-up Table Unit: Plan Above Hat Shelf
313 - Dressing Room Details, Make-up Table Unit: Section A-A
314 - Dressing Room Details, Make-up Table Unit: Section B-B
315 - Dimensioned Section Through Office Structure Between N-M
316 - Typical Section Through Offices 49.00 Level G
317 - Office Corridor, Corridor Partition and Doorframe G.A. Details
318 - Sketch Details of Dressing Room Corridor General Arrangement and Skirting Details
319 - Dressing Room Area - Men's Lavatories 3C01 3D01 3E11 3F13, Women's Lavatories 3C02 3D0[?] 3E12 3F1[?]
320 - Showers and Bathrooms Dressing Room Area 3C04, 3D03, 3E13, 3F11, 3C05, 3D04, 3E14, 3F12
321 - Men's Lavatories 3G06 3H07, Women's Lavatories 3G07 3H08, Offices Area
322 - Men's Lavatory, Women's Lavatory, Stage Door Area 3C09 3C10
323 - Men's Lavatory, Women's Lavatory, 3E05 3E06, Canteen Area [2103 and 2104]
324 - Men's Lavatory 3F15, Women's Lavatory 3F16, Level 39.75 [3422 and 3423]
325 - Upper Theatre and Offices Group Mens Lavatory 3F09 Womens Lavatory 3F10 Level 38.00
326 - Upper Theatre and Offices Group, Lavatories on Levels 39.00 and 59.25. Men's 3G09 [49.00] 3H05 [59.25], Women's 3G10 [49.00] 3H06 [59.25]
327 - Women's Lavatories, Men's Lavatories, 3G11 3G12 3H03 3H04, Office Area
328 - Upper Theatre and Offices Group Section on Diagonal of 38.00 49.00 59.25 69.00 Level
329 - Layout of Typical Single (DR 1) and Two Person Dressing Rooms (DR 2)
330 - Roof Structure Over Stair 13 and Lift Motor Room 7
331 - Wardrobe Workroom Dept Section Above 39.75' Level Grids 12/13 M/N
332 - Upper Theatre and Offices Group Setting Out of Property Store etc Backstage Upper Theatre (39.75)
333 - Upper Theatre and Offices Group Setting Out of Property Store etc Backstage Upper Theatre (49.00)
334 - Upper Theatre and Offices Group Setting Out of Projection Room etc Backstage Upper Theatre (59.25)
335 - Upper Theatre and Offices Group Plans of Lighting Perch Stair Stage Right Upper Theatre Stair 52 (Stair 51 Handed)
336 - Upper Theatre and Offices Group Section Through Lighting Perch
337 - Upper Theatre, Auditorium Ceiling, Half Reflected Plan
338 - Office Block, Setting Out of Shuttering
339 - Directors Dressing Room Layout
340 - Sections Men's Lavatories 3C01, 3D01, 3E11, 3F13, Dressing Room Block
341 - Women's Lavatory 3C02 3D02 3E12 3F14 Section Dressing Room Area
342 - Dressers Room (Tea Kitchen) Levels 12.00, 21.25, 30.50, 39.75
343 - Details of Dressing Room Make-Up Table and Cupboard
344 - Details of Dressing Room Light Fitting, Loudspeaker/Hat Shelf F.R. Panel Between DR1 and DR2
345 - Elevation of Lockers and Duct 6 Person Dressing Room
346 - Dressing Table Unit - 6 Person Dressing Room
347 - Dressing Table Unit - Two Person Dressing Room
348 - Dressing Table Unit - 1 Person Dressing Room
349 - Dressing Rooms Type DR1 and DR1a
350 - Upper Theatre and Offices Group 49.00 Level Office Corner
351 - Upper Theatre and Offices 59.25' Office Corner, P/Q-4/5, 69.00' Soffit Dotted E/F-4/5, P/Q-12/13 Similar
352 - Upper Theatre and Offices Group Large Rehearsal Room Level 25.25 and 27.00
353 - Upper Theatre and Offices Group Large Rehearsal Room Section A-A B-B
354 - Upper Theatre and Offices Group, Vomitory, Actors Waiting Space, 33.75 and 39.75
355 - Upper Theatre and Offices Group, Side Stalls
356 - Upper Theatre and Offices Group, Central Stalls, Level 38.00 to 49.00
357 - Upper Theatre and Offices Group Grids G-F Plan at 16.00
358 - Upper Theatre and Offices Group. Grid G-H and 5-7. Level 16.00' Plan
359 - Upper Theatre and Offices Group Entrance Auditorium Bar Store Projection Room
360 - Upper Theatre and Offices Group Sections Through Rehearsal Room and Corridor Levels 49.00 and 59.25
361 - Upper Theatre and Offices Group Upper Theatre Wall Elevations
362 - Upper Theatre and Offices Group Balcony
363 - Upper Theatre and Offices Group, Large Rehearsal Room[,] Corridor Stage Staff Room, Sprinkler and Lighting Layout
364 - Upper Theatre and Offices Group, Wall Elevation and Sections
365 - Upper Theatre and Offices Group, Plan at 89.08
366 - Upper Theatre and Offices Group, Soffit Balcony
367 - Upper Theatre and Offices Group, Fly Tower at 142.25
368 - Upper Theatre and Offices Group, Offices 49.00', 59.25', Typical Window Elevation (Internal)
369 - Upper Theatre and Offices. Assembly Details of Window, Sill, Heater, Trunking, Partition
370 - Upper Theatre and Offices. Office Partitions. Typical Corridor and Cross Partition
371 - Upper Theatre and Offices. Office Partition. Corridor Door and Side Panel
372 - Upper Theatre and Offices. Office Partition Details, at Waiting Spaces 2./4
373 - Section Through Dying Room and Wig Workroom (Levels 49.00 and 59.25)
374 - Plan of Dying Room and Costume Spraying Room
375 - Upper Theatre and Offices. Office Door Details
376 - Details of Door to Dressing Rooms Frame Type 5
377 - Dying Room Tiles Details
378 - Door Opening to Personnel Lift, Upper Theatre Fly Tower (9-10L)
379 - Upper Theatre and Offices Group, Layout of Control Rooms, Level 49.00
380 - Elevations of Armour/Masks and Leather Workrooms, Level 59.25'
381 - Window and Door Details (Central Courtyard) Workrooms. Level 49.00
382 - Elevation and Plan of Windows and Balcony Door on 49.00 L. (Central Courtyard) Workrooms Grid M-N
383 - Section Through Window and Heating and Skirting Trunking on 59.25' Level. Workrooms
384 - Heating + Skirting Trunking Panels on 49.00 + 59.00 Level (Central Courtyard)
385 - Elevation and Plan of Win[d]ows on 49.00 Level (Central Courtyard) Grid 11
386 - Upper Theatre and Offices Group, Control Rooms Level 49.00
387 - Weather Grill in Central Courtyard on 49.00 Level in Wig Workroom
388 - Goods Reception Door Opening C306 Level 16.00, Grid Ref G-F (Louvre LC303 and Door Frame 19)
389 - Upper Theatre and Offices Group, Projection/Translation Room
390 - Upper Theatre and Offices. Office Corners E-F/4-5 and P-Q/12-13. Plan of Heater/Skirting Trunking
391 - Upper Theatre and Offices. Office Corner P-Q/4-5, Plan of Heater/Skirting Trunking
392 - Upper Theatre and Offices. Offices - End Condition. Plan of Heater/Skirting Trunking
393 - Elevation of Door Openings E321 and E324 in Corridor and Stage Staff Room No.1 (Door Openings E329 and E327 are Mirrored) Level 27.00
394 - Details of Door Opening E321 (and E329 mirrored) Level 27.00
395 - Elevations in Stage Door Area
396 - Details of East Wall: Masks/Armour Workroom (West Wall Leather Workroom Similar)
397 - Doors H370 + H371 in Dying Room, Frames Above Tiles Skirting
398 - Dressing Table Unit - Supers Room
399 - Dressing Table Unit - Supers Room
400 - Stage Door - Porter's Room and Firemen's Room. Plans, Sections, Elevations
401 - Upper Theatre and Offices, Porter's Room, Rear Wall Indicator Panel
402 - Upper Theatre and Offices Group. Telephone Booths Near Stage Door
403 - Upper Theatre and Offices Group, Control Rooms Level 49.00, Concrete Duct
404 - Upper Theatre and Offices Group, Layout of Ceiling Panels and Hangers
405 - Upper Theatre and Offices Group, Section and Plan Small Ceiling Panel Upper Theatre (+1/4"=1'-0" Section Through All Diff. Types)
406 - Upper Theatre and Offices Group, Layout of Lighting Bridges and Catwalks
407 - Upper Theatre and Offices Group, Elevation of Front Wall in Auditorium
408 - Upper Theatre and Offices Group, Section and Plan, Lighting Bridge 2
409 - Overhead Trunking Details Workrooms
410 - Overhead Trunking Details Workrooms
411 - Lower Theatre Stair 41
412 - Lower Theatre Stair 42 [71.00 102.42]
413 - Lower Theatre Plan at 47.00
414 - Lower Theatre Plan at 47.00
415 - Lower Theatre Plan at 62.00
416 - Lower Theatre Plan at 62.00
417 - Lower Theatre Plan at 71.00
418 - Lower Theatre Plan at 71.00
419 - Lower Theatre Plan at 83.00
420 - Lower Theatre Plan at 83.00
421 - Lower Theatre Plan at 91.00
422 - Lower Theatre Plan at 91.00
423 - Lower Theatre Plan: Level 102.42
424 - Lower Theatre Plan at Level 102.42
425 - Smoke Outlets and Louvres, Level 103, Lower Theatre Fly Tower
426 - Smoke Outlets and Louvres, Level 143.42, Upper Theatre Fly Tower
427 - Lower Theatre Auditorium Roof Details
428 - Lower Theatre Detail of Roof Parapet
429 - Lower Theatre Auditorium Roof Details
430 - Lower Theatre Auditorium Wall Lining
431 - Lower Theatre Stair No 34
432 - Lower Theatre, Plan of Stage Offices and Property Store, Level 12.00
433 - Lower Theatre Auditorium Plan Front
434 - Lower Theatre Auditorium Plan Level 16.00 Rear
435 - Lower Theatre Auditorium Section - Long on C/L Front
436 - Lower Theatre Cross Sections - Auditorium. A Between M-L, 7'-3" from M, B Between M-N, 1'-6" from M
437 - Lower Theatre Balcony Plan 34.50-38.00 Levels
438 - Lower Theatre - Auditorium. A Side of Balcony Plan at 24.75 Level, B Side of Balcony - Long Section Between 14-13, 3'-0" from 14
439 - Lower Auditorium Formwork, Stalls: West Wall
440 - Lower Auditorium Formwork, Stalls: East Wall
441 - Lower Auditorium Formwork, Control Rooms and Balcony Front
442 - Lower Auditorium Concrete Details
443 - Lower Theatre Control Suite Plan and Sections
444 - Lower Theatre Auditorium, Recess for Loudspeakers in Balcony Soffit
445 - Lower Auditorium Reflected Ceiling Plan
446 - Lower Auditorium Lighting Bridge Routes Through Trusses [7] and 2
447 - Lower Auditorium Plan Above Ceiling 51.00
448 - Lower Auditorium Ceiling/Lighting Bridges
449 - Lower Theatre Projection Room Details
450 - Lower Theatre Elevation of Projection Room Wall
451 - Lower Theatre Panelling Layout Sidewalls
452 - Lower Theatre Cross Sections - Auditorium. A Between M-L, 7'-3" from M, B Between M-N, 1'-6" from M
453 - Lower Theatre Lighting Perches Details
454 - Elevation of the North Wall of the Lower Theatre Stage Staff Lift Door Opening Nos: B 53, C472, F 422, G 404, H 408, J 405, K 402
455 - Door and Frame for the Lower Theatre Stage Staff Lift Door Opening Nos: B 53, C 472, F 422, G 404, H 408, J 405, K 402
456 - Acoustic Wall Lining Rehearsal Room East and West (Level 12.00)
457 - Lower Theatre Guard Rails on Lighting Perches
458 - Auditorium Seats Typical Sections: Type 'A' and 'B'
459 - Auditorium Seats Typical Sections Type 'C'
460 - Auditorium Seats Typical Section Type 'C1'
461 - Auditorium Seats Plan Type 'A'
462 - Auditorium Seats Plan Type 'B'
463 - Auditorium Seats Plan Type 'C'
464 - Upper Theatre: Pit Seating Over Vomitory
465 - Details Theatre Projects Box in the Auditoria
466 - FOH Lower Theatre Elevation: Windows Nos. CW 204, 205, EW 206, 207 and FW 206
467 - F.O.H. Upper Theatre Windows: CW 209, CW 210
468 - F.O.H. Upper Theatre Elevation: Window IW 205, GW 205, IW 208, IW 207, GW 207, GW 208, IW 204, GW 204
469 - FOH Lower Theatre Elevation: Windows Nos. CW 201, 202, EW 201, 202 and FW 201, 202
470 - F.O.H. Upper Theatre Windows FW 208, FW 213, CW 212, EW 211, EW 212, CW 213, CW 220, CW 218, CW 217, CW 216
471 - FOH Upper Theatre Windows Nos: IW 210, 209. HW 203. GW 210, 209
472 - F.O.H. Upper Theatre Elevation: Window GW 206
473 - F.O.H. Upper Theatre Elevation: Window IW 206
474 - F.O.H. Upper Theatre Windows: CW 214, CW 215
475 - F.O.H. Upper Theatre Windows: FW 210, FW 211
476 - F.O.H. Lower Theatre Elevation: Windows Nos. CW 203, EW 203, 205. FW 203, 205
477 - Studio Theatre CW 305
478 - F.O.H. Upper Theatre Windows: CW 301 EW 302 EW 303 EW 304
479 - F.O.H. Upper T' Windows, EW 305 EW 306 CW 302
480 - FOH Upper Theatre, Entrance Doors and Glazed Screen to Restaurant at 27.00 Level
481 - FOH Upper Theatre, Windows to Accommodation, Adjacent Buttress
482 - Lifts 1-4, Detail of Lights at Side of Doors
483 - Vestibules No 1 No 2, Level 16, F.O.H.
484 - Vestibules 3 and 4, Level 27, F.O.H.
485 - Vestibules No 5 and No 6, Level 38.00, Front of House
486 - Vestibule Panel Details Front of House
487 - Brick Paving Details Level 16.00 Typical
488 - Front of House Telephone Kiosk in Box Office
489 - F.O.H. Shelf in Telephone Kiosk
490 - Telephone and Hosereel Recess - G.L. L/17 Details
491 - Telephone and Hosereel Recess - G.L. L/17 Details
492 - Telephone and Hosereel Recess - G.L. L/17 Details
493 - Typical Hosereel and Wall Panelling Details
494 - Front of House, Fire Pushes in Wall Panels, Levels 16.00 27.00 and 59.25
495 - Front of House, Coinboxes, Level 49.00 2 Structur Handed, Level 59.25 2 Structur Handed
496 - Front of House, Coinboxes, Level 27.00, Level 38.00 2 Structur Handed
497 - Front of House, Bars, Speed Rack, Sliding Flap Bars Level 69.50
498 - Front of House, Buffets, Cash Till, Hot Plates, Shelves
499 - Front of House, Bars, Cash Till, Sink
500 - Front of House, Bars, Level 69.50, Rear Counter, 2 Handed
501 - Front of House, Buffet Level 38.00, Rear Wall
502 - Front of House, Buffets Level 59.25, Rear Wall
503 - Front of House, Bars Level 49.00, Rear Wall
504 - Front of House, Bars Levels 16.00 and 27.00, Rear Wall
505 - Front of House, Bar Level 16.00, Rear Wall
506 - Front of House, Bars and Buffets, Ceiling Details
507 - Front of House, Bars and Buffets, Side Wall Panelling and Door Dets. (16.00, 27.00 and 38.00 Levels)
508 - Electrical Cupboard and Ducts, Door and Panelling Details
509 - F.O.H. Lighting Bars. Positions. Details. Type '6a' Type '3'
510 - F.O.H. Lighting Bars, Type '6' and '4'
511 - Front of House, Detail of Suspension of Television Monitors, Levels 16.00 27.00 49.00
512 - Front of House, Detail of Casing for the Television Monitors at Levels 16.00 49.00, 27.00 69.50
513 - Fan Convectors on 59.00L, Dyeing Room, Costume Spraying Room
514 - Louvres and Expansion Joint, Adj. Stair 12, Level 69.00' Roof
515 - Upper Theatre and Offices Group. Acoustic Lining Details to Rehearsal Rooms 1 and 2 (49.00, 59.25)
516 - Upper Theatre and Offices Group. Stage Door Counter Jamb Detail
517 - Upper Theatre and Offices Group. Stage Door Counter Head and Sill Details
518 - Upper Theatre and Offices Group. Stage Door Counter. Elevation Details
519 - Upper Theatre and Offices Group. Partition to Storeman's Room (Rm 0123)
520 - Upper Theatre and Offices Group. Counter Details - Storeman's Room
521 - Upper Theatre and Offices Group. Counter Details - Storeman's Room
522 - Upper Theatre Panelling Details, Loudspeaker Panels at Level 69.50
523 - Upper Theatre Panelling Details, Loudspeaker Panel at Level 69.50
524 - Upper Theatre Projection Room Window
525 - Upper Theatre Translation Room Windows
526 - Upper Theatre Projection Room Window Details
527 - Upper Theatre Projection Room Cill Details
528 - Upper Theatre Translation Room Window Details
529 - Upper Theatre Loudspeaker Panel and Adjacent Wall Panels at Level 49.00
530 - Upper Theatre Loudspeaker Panel and Adjacent Wall Panels at Level 49.00
531 - Upper Theatre and Offices Group Ventilation Louvres Between W1 and W29 North and South
532 - Upper Theatre and Offices Group Typical Fixings for Catladders and Vert. Lightingbars
533 - Porter's Room - Front Counter Plan, Firemen's Room - Drawer Unit Plan and Section
534 - Porter's Room - Rear Wall Plans
535 - Porter's Room - Rear Wall Sections
536 - Upper Theatre: Auditorium. Details Removable Rostrum. Above Vomitory Stairs
537 - Upper Theatre and Offices Group Booking Services Office Cupboard for Telefon Equipment
538 - Upper Theatre and Offices Group Booking Services Office Cupboard for Telefon Equipment Section B-B
539 - Upper Theatre and Offices Group Booking Services Office Cupboard for Telefon Equipment Sec. A-A
540 - Studio Theatre Section Through Stairs A, B, C and D
541 - Studio Theatre Floor Details, 4.22 750 Stairs, Stair Cover
542 - Studio Theatre Wall Lining
543 - [Studio Theatre Duct Space by Grid Line 5, Detail, Plans, Sections and Elevation]
544 - Studio Theatre Detail of Smoke Outlet Duct on Grid Line "O"
545 - Studio Theatre Details: Stairs B and C with References to Stairs A and D
546 - National Theatre Studio Theatre 16.00 Level Gallery Plan
547 - National Theatre Studio Theatre 24.00-Level Gallery Plan
548 - National Theatre Studio Theatre 7.50 Level Plan and Seating Layout
549 - National Theatre Studio Theatre 7.50 Level Plan with Seating Layout Central Stage
550 - Studio Theatre Schedule of Balustrade Panels
551 - Green Room Detail of Suspension of Television Monitor
552 - Studio Theatre Detail of the Smoke Outlet Duct Near Grid Line "L"
553 - Studio Theatre Layout of the Acoustic Panels on the West Wall
554 - Studio Theatre Details of Auditorium Wall Lining
555 - Studio Theatre Details of Auditorium Wall Lining
556 - Studio Theatre Details of Auditorium Wall Lining, Fire Extinguisher Recess
557 - Studio Theatre Ventilation Grills Level 7.50 Left and Right of Stage Near Grid Line M
558 - Studio Theatre Pit and Stage Floor Details
559 - Cottesloe Theatre Bar at 27.00, Box Office & Bookstall at 16.00
560 - Cottesloe Theatre, Bar at 27.00, Box Office and Bookstall at 16.00
561 - Cottesloe Theatre Details of Bar and Box Office Bookstall
562 - Studio Theatre Access Panel in Corridor at the Stage End
563 - Studio Theatre Front of House, Access Panels, Lavatories 2903 2907 0905
564 - Studio Theatre Recessed Door Handles for Some of the F.O.H. Doors
565 - Lower Theatre Loudspeaker + Panelling Details
566 - Lower Theatre Projection Room Window Details
567 - Lower Theatre Typical Details of Lighting Bridges (No. 4)
568 - Lower Theatre Typical Details of Lighting Bridges (Nos 2+[3])
569 - Lower Theatre Typical Details of Lighting Bridges (No 1)
570 - Lower Auditorium Panelling Details, Camera/Lighting Outlets
571 - Lower Theatre Panelling Details (Sheet 2)
572 - Lower Theatre Panelling Details (Sheet 3) Loudspeaker Panels
573 - Exit Vestibules Lower Theatre L.9.66 Front of House
574 - Entrance Lobby Lower Theatre L.16 Front of House
575 - Lower Theatre. Auditorium Ceiling
576 - Lower Theatre. Loudspeakers in the Ceiling
577 - Reflected Ceiling Plan Rehearsal Rooms East and West Level 12.00
578 - Lower Theatre. Projection Room. Window Details
579 - Acoustic Wall Lining Details. Rehearsal Rooms
580 - Workshop Rooflights Section A A
581 - Workshop Rooflights Plan and Details
582 - Front of House Internal Balustrades Level 27.00
583 - Front of House Internal Balustrades Level 38.00
584 - Front of House Internal Balustrades Levels 27.00 and 38.00
585 - Front of House Internal Balustrades Levels 27.00 32.92 and 38.00
586 - Front of House Internal Balustrades Levels 59.25 and 69.50
587 - Front of House Balustrade Typical Details
588 - Auditorium Typical Floor Detail
589 - Upper Theatre and Offices Group: Edge Detail of Loudspeaker in Conc. Wall, Outline of Loudspeaker in Front Wall
590 - Door Opening Schedule Basement
591 - Door Opening Schedule Upper Theatre and Offices Level G [49.00]
592 - Door Opening Schedule Studio Theatre: Entrance Levels C [16.00] and E [27.00]
593 - Interior Softwood Jamb Back of House
594 - Interior Softwood Head + Lintel Back of House
595 - Softwood Door Types
596 - Schedule of Catladders to be Provided as Builders Work for Mechanical Service and Lift Installations in Plant Rooms and Motor Rooms
597 - Schedule of Internally Illuminated Exit Signs
598 - Upper Theatre Section on Axis Part 2 - Auditorium (Internal Finishes)
599 - Revised Audi/Ceiling to Upper Theatre
600 - Revised Audi/Ceiling Upper Theatre
601 - National Theatre Cross Sections Through Workshops
602 - National Theatre Roof Plant Room 69.50 Level
603 - National Theatre Roof Plant Rooms Level 99.00
604 - National Theatre Roof Plant Rooms Level 110.50'
605 - National Theatre Section Thro[ugh] Plant Rooms
606 - Basement Plan
607 - National Theatre Dimmer Room Upper Theatre
608 - National Theatre Dimmer Room Upper Theatre
609 - National Theatre Upper Auditorium Dimmer Rooms Etc
610 - Revised Electrical Plant Layout
611 - Revised Layout of Sound Studio, Stores Etc
612 - [Dimmer Rooms]
613 - National Theatre Stair at Front of Upper Theatre Fly Tower
614 - Lower Theatre Control Rooms and Balcony Soffite
615 - Lower Theatre Control Rooms and Balcony Soffite
616 - Sketch of Door 'D' at Stair 14
617 - National Theatre North Wall: L.T.: 38.00-49.00
618 - Lower Theatre Light Recess Under Balcony
619 - Lower Auditorium Control Room Windows
620 - Lower Auditorium Control Room Windows
621 - Lower Theatre Projection Room Window/Wall
622 - Fibreglass Workroom Rooflight, Level 69.00, Expansion Joint Details
623 - National Theatre Upper Theatre Lighting Bridge 4 (Proposed Extension of Lighting Bridge 4 Between the Two Central Hangers)
624 - Proposed Rising Handrail 7 Solid Slabs with ~6" Gap National Theatre Upper Auditorium
625 - Lower Theatre Removable Rostrum
626 - Section Through Projector Room, Control Room Suite
627 - Detail of Fixing of Supply Grille Control Room Suite
628 - Projection Room Service Unit Upper Theatre: Level 79.00
629 - Elevation of Panelled Wall Studio Theatre National Theatre
630 - [Architectural Lighting]
631 - [Plan at Grid Level]
632 - Plan at Grid Level
633 - [Plan at Grid Level]
634 - Layout of Wagon Tracks
635 - Layout of Removable Traps
636 - [Lighting Gallery]
637 - Removable Area of Stage Floor and Position of Traps in Rearstage Revolve Wagon
638 - Fly Tower
639 - Plan of Main Stage with Removable Traps and Beams
640 - [Cottesloe Studio Theatre Auditorium]
641 - [Cottesloe Studio Theatre Auditorium]
642 - Moveable Rostrum
5 - Denys Lasdun & Partners / Flint & Neill Ltd / Davis, Belfield & Everest Drawings
6 - Mole-Richardson (Stage & Studio Engineering) Ltd Drawings
7 - Evershed Power-Optics Ltd Drawings
8 - Hall Stage Equipment Ltd Drawings
9 - Tele-Stage Associates Ltd Drawings
10 - Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings
11 - Crown House Engineering Ltd Drawings
12 - Rank Strand Electric Ltd Drawings
13 - Varilectric Ltd Drawings
14 - Waagner-Biro Drawings
15 - P E Kemp Engineers Ltd Drawings
16 - Gough & Co (Hanley) Ltd Drawings
17 - J S Edwards (Engineers) Ltd Drawings
18 - United Lift & Escalator Co Ltd Drawings
19 - Loxton Engineering Services Ltd Drawings
20 - Ainslie Controls Ltd Drawings
21 - Outline of Slipring Collector Column
22 - The Lyttelton Theatre Side Elevation
23 - The Olivier Theatre Plan at Stage Level
Powered by
CalmView
© 2008-2025