Skip to main content.
Medium FontSize
Larger FontSize
Largest FontSize
Home
Advanced Search
Catalogue
Persons
Places
Showcase
Image Gallery
Home
About the Catalogue
Search the Catalogue
Search by Person
Search by Production
Search by Role
How to Search
Useful Links
Contact Us
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
TPC - Theatre Projects Consultants Collection
1 - Business Files
2 - Standardised Paperwork - Letters, Contracts, Schedules and Specfications
3 - Stage Machinery Operating Instructions, Manuals and Handbooks
4 - Press and Publications
5 - Architectural and Engineering Drawings
1 - National Theatre - Stage Engineering Drawings
2 - Theatre Projects Consultants Ltd Drawings
3 - Theatre Projects Consultants Ltd (Denys Lasdun & Partners) Drawings
4 - Denys Lasdun & Partners Drawings
5 - Denys Lasdun & Partners / Flint & Neill Ltd / Davis, Belfield & Everest Drawings
1 - Upper Theatre and Offices Group, Dressing Rooms, Details of Conduit Links to Electrical Riser from Skirting Trunking and Corridor Trunking, Levels 12.00, 21.25, 30.50, 39.75
2 - Floodlighting Conduit Layout Levels 69.50, 79.50, 87.50, 90.50, 106.00
3 - Lower Theatre, Floodlighting and Conduit Layout, Levels 43.00 and 53.00
4 - Basement Car Park East, Conduit Layout (Lighting)
5 - Basement Car Park North, Conduit Layout (Lighting)
6 - Pipe Duct Between Plantroom 2 and 3, Level 6-25, Conduit Layout
7 - Plantroom No.2, Lower Theatre Basement, Conduit Layout
8 - Upper Theatre F.O.H., Conduit Layout (Floor Finish), Level 16.00
9 - Lower Theatre F.O.H., Conduit Layout, Level 16.00 (Floor)
10 - Upper Theatre F.O.H. Part 1, Conduit Layout (In Situ), Level 38.00 (Floor)
11 - Lower Theatre F.O.H. Part 2, Conduit Layout (Floor Finish), Level 27.00 (Floor)
12 - Upper Theatre F.O.H. Part 2, Conduit Layout (Floor Finish), Level 38.00 (Floor)
13 - Lower Theatre F.O.H. Part 1. Conduit Layout (Insitu) Level 38.00+32.92 (Floor)
14 - Upper and Lower Theatre F.O.H., Walkway (In Situ), Level 32.92
15 - Upper Theatre F.O.H. (Part 2), Conduit Layout (Floor Finish), Level 49.00 (Floor)
16 - Lower Theatre F.O.H. Conduit Layout (In Situ), Level 49.50
17 - Upper Theatre F.O.H. Part 2, Conduit Layout (Floor Finish), Level 59.25 (Floor)
18 - Upper Theatre F.O.H. Part 2, Conduit Layout (Floor Finish), Level 69.50 (Floor)
19 - Upper Theatre F.O.H., Conduit Layout (In Situ), Level 79.75
20 - Conduit Layout, F.O.H. Staircase O1 and O2, Level 16.00
21 - Conduit Layout, F.O.H. Staircase O1 and O2, Level 27.00
22 - Conduit Layout, F.O.H. Staircase O1, O2 and O3, Level 38.00
23 - Conduit Layout, F.O.H. Staircase O1 and O2, Level 49.00
24 - Conduit Layout, F.O.H. Staircase O1 and O2, Level 59.25'
25 - Conduit Layout, F.O.H. Staircase O1, O2 and O4, Level 69.50'
26 - Conduit Layout, Staircase 21
27 - Conduit Layout, Front of House, Stair 16, Section AA and BB
28 - Bar and Box Office F.O.H., Conduit Layout, Level 16.00
29 - Bar Area F.O.H., Conduit Layout, Level 27.00
30 - Front of House, Buffet Area, Level 38.00, Conduit Layout
31 - Front of House, North Corridor, Level 69.50, Conduit Layout
32 - Front of House Level 27.00 Conduit Layout
33 - Front of House, South Area, Level 49.00, Conduit Layout
34 - Front of House South Area. Level 59.25 Conduit Layout
35 - Front of House, North Area, Level 59.25, Conduit Layout
36 - Front of House, Bar, Level 16.00, Conduit Layout
37 - Upper Theatre and Offices Group, Dressing Rooms, Corridor and Side Areas, Levels 12.00, 21.25, 30.50, 39.75, Conduit Layout
38 - Upper Theatre and Offices Group, Stage Door Entrance, Level 16.00, Conduit Layout (Part 2)
39 - Upper Theatre and Office Group, Canteen and Green Room, Level 27.00, Conduit Layout Part 2
40 - Cottesloe Theatre Basement Plan Conduit Layout
41 - Plan at 7.50 Level, Cottesloe Theatre, Stage Level, Conduit Layout
42 - Cottesloe Theatre Plan at 16.00 Level Conduit Layout (Part 1)
43 - Cottesloe Theatre Plan at 24.00 and 27.00 Level Conduit Layout (Part 1)
44 - Auditorium Conduit Layout
45 - Conduit Layout for Lighting Above Grid
46 - Auxiliary Services, Level 49.00, Grids E-L
47 - Plantroom No. 9, Level 79.50, Conduit Layout
48 - Perimeter Duct Between Air Conditioning Plant No. 9 and 1, Level 79.50, Conduit Layout
49 - Perimeter Duct Between Plant Rooms 9 and 12, Level 79.50, Conduit Layout
50 - Plantroom No. 10, Level 69.50, Conduit Layout
51 - Plantroom 11, Level 79.25, Conduit Layout
52 - Plantroom 13, Calorifier Chamber, Level 69.50, Conduit Layout
53 - Boiler House, Plant Room 13, Level 69.50, Lighting Conduit Layout
54 - Plantroom 13 - Boiler House Emergency Lighting and Fire Alarm Services, Conduit Layout
55 - Boiler House, Plant Room 13, Level 69.50, Power and Control, Lighting Conduit Layout
56 - Cooling Towers, Plant Room 14, Level 111.25, Conduit Layout
57 - Cold Water and Oil Storage Chamber, Level 90.50, Conduit Layout
58 - Upper Theatre and Offices Group, Side Stalls, Conduit Layout
59 - Upper Theatre and Offices Group, Wall Elevations, Conduit Layout
60 - Upper Theatre and Offices Group, Soffit of Balcony, 49.00 Level, Conduit Layout
61 - Primary and Safety Lighting Services, Cottesloe Theatre Foyer and Staircase 46, Conduit Layout
62 - Lower Theatre, Plan at Levels 34.50 and 38.00, Conduit Layout (Power)
63 - Lower Theatre Auditorium, Plan of Ceiling Under Balcony, Conduit Layout
64 - Lower Theatre and Workshops, External Concrete Balustrade, Plan at 49.50 Level, Conduit Layout
65 - Scenery Pit Details
66 - Proposed Foundations for Highlevel Walkway Adjacent to National Film Theatre
67 - Basement Plan Sheet 1 of 4
68 - Basement Plan Sheet 2 of 4
69 - Basement Plan Sheet 4 of 4
70 - Foundations Sheet 2 of 4
71 - Foundations Sheet 4 of 4
72 - North Retaining Wall Elevations and Sections Outlines
73 - East Retaining Wall Elevations and Sections Outlines
74 - West Retaining Wall Elevations and Sections Outlines
75 - South Car Ramp and Retaining Wall Details
76 - Ground Floor Plan Sheet No.1 of 4
77 - Ground Floor Plan Sheet 2 of 4
78 - Ground Floor Sheet 3 of 4
79 - Ground Floor Plan Sheet 4 of 4
80 - Car Park Exhaust Duct North Side Sheet 1
81 - Car Park Exhaust Duct North Side Sheet 2
82 - Main Fly Tower: Developed Elevation
83 - Upper Theatre Fly Tower General Arrangement 1
84 - Upper Theatre Fly Tower General Arrangement 2
85 - Upper Theatre Fly Tower General Arrangement 3
86 - Upper Auditorium Lighting Bridges and Large Ceiling Panels, Typical Steelwork Details
87 - Open Theatre Raft Footing Sections - Sheet 1
88 - Car Park Exhaust Duct South Side Sheet 2
89 - Studio Theatre 7.50 Level Reinforcement Details
90 - Studio Theatre 12.00 and 16.00 Levels. Reinforcement Details
91 - Studio Theatre 24.50, 26.50 and 27.00 Levels Reinforcement Details
92 - Upper Theatre Fly Tower Proposed Roof Steelwork Scheme 2
93 - Studio Theatre Modified Roof Trusses
94 - Proposed Anchorage of Sheet Pile River Wall to Retaining Wall
95 - Open Theatre and Studio Theatre Raft Foundation Plan
96 - Open Theatre Raft Footing Sections - Sheet 2
97 - Open Theatre Raft Footing Sections - Sheet 3
98 - South Retaining Wall Elevations and Sections Outlines
99 - Car Park Exhaust Duct South Side Sheet 1
100 - National Theatre Wall Elevation W30S
101 - Upper Theatre Fly Tower Plan at 83.50 Level, Showing Inserts
102 - Upper Theatre Back of Fly Tower Level 39.75 Sheet 1 of 4
103 - Studio Theatre 12.00 and 16.00 Levels
104 - Studio Theatre 24.00, 26.50 and 27.00 Levels
105 - [Studio Theatre 16.00 and 24.50 Level Galleries Structural Steel and Amended detail of Beams]
106 - Basement Plan Setting Out Sheet 1 of 4
107 - Basement Plan Setting Out Sheet 2 of 4
108 - Sections Thro' Ground Floor
109 - Ground Floor Plan East Sheet 1 of 4
110 - Ground Floor Plan North
111 - Ground Floor Plan South
112 - Ground Floor Plan Lower Theatre
113 - Braithwaite Tank Support Plant Room No. 3
114 - Elevations of R.C. Walls No 1 to 8 Inclusive
115 - Details of Sign 'C' at Entrance to Site from Upper Ground
6 - Mole-Richardson (Stage & Studio Engineering) Ltd Drawings
7 - Evershed Power-Optics Ltd Drawings
8 - Hall Stage Equipment Ltd Drawings
9 - Tele-Stage Associates Ltd Drawings
10 - Crown House Engineering Ltd (Theatre Projects Consultants Ltd) Drawings
11 - Crown House Engineering Ltd Drawings
12 - Rank Strand Electric Ltd Drawings
13 - Varilectric Ltd Drawings
14 - Waagner-Biro Drawings
15 - P E Kemp Engineers Ltd Drawings
16 - Gough & Co (Hanley) Ltd Drawings
17 - J S Edwards (Engineers) Ltd Drawings
18 - United Lift & Escalator Co Ltd Drawings
19 - Loxton Engineering Services Ltd Drawings
20 - Ainslie Controls Ltd Drawings
21 - Outline of Slipring Collector Column
22 - The Lyttelton Theatre Side Elevation
23 - The Olivier Theatre Plan at Stage Level
Powered by
CalmView
© 2008-2025